top of page
First Cubicle
CONCRETE IMPRINT : METHOD STATEMENT
To suppy labour to lay 100mm thick ready mix concrete grade 25 with one layer of BRC A6 wire reinforcement.
After that to supply and lay colour hardener using a dry shake method at rate 3.0 - 4.0kg/m2 on the surface after concrete has been throughly troweled. Apply color releaser at 0.1-0.13kg/m2, than tap in mats of selected pattern.
After that, pressure wash release agent. Finally apply sealer at 3-3.5m2/liter.
bottom of page